Analisis kombinasi alat berat pekerjaan timbunan pada proyek penataan landfill zona b tpa piyungan
(2023-07-18)
Zona B Landfill Arrangement of TPA Regional Piyungan Project is a
project that aims to close TPA in the zone to become a green open space.
The heavy equipment used for heap work is excavators and bulldozers
with a solid ...
Analisis penjadwalan waktu pelaksanaan proyek dengan Linear Scheduling Method (LSM) pada proyek pembangunan perumahan
(2023-07-18)
Project scheduling is one of the planning results that can provide
information about the schedule or time of the plan and the progress of the
project in the performance of resources in the form of equipment,
materials, ...
Analisis risiko pada pekerjaan pembangunan Bendungan Bener Kabupaten Purworejo Paket 4 (MYC)
(2023-07-18)
Infrastructure development in Indonesia is carried out to improve the
welfare of the society. The Bener Dam Construction Project Package 4
(MYC) in Purworejo Regency is utilized to fulfill the water supply of
1500 l/dt, ...
Risk assessment berdasarkan konsep 4 pilar keselamatan konstruksi pada pekerjaan blasting
(2023-07-18)
The construction sector is a high-risk business sector. One of the risks in
the construction world can be sourced from construction safety aspects
following PERMEN PUPR No. 10 of 2021 (labor, tools, materials, ...