Analisis risiko pada pekerjaan pembangunan Bendungan Bener Kabupaten Purworejo Paket 4 (MYC)
Date
2023-07-18Author
Ardiyanto, Bukhori A
Wibowo, Agung
Nugraheni, Fitri
Metadata
Show full item recordAbstract
Infrastructure development in Indonesia is carried out to improve the
welfare of the society. The Bener Dam Construction Project Package 4
(MYC) in Purworejo Regency is utilized to fulfill the water supply of
1500 l/dt, existing irrigation water supply of 13,589 Ha, and a new
irrigation area of 1,110 Ha, generating power plant of 6 MW of
electricity, developing tourist areas, and flood control. However, the
dam construction has various risks that need to be anticipated. The risks
studied in this research is limited to financial, technical and
operational, political, and social aspects. Risk identification for each
aspect and risk assessment are conducted through discussions with
construction experts or the contractor. The subsequent risk assessment
is plotted on a probability and impact matrix based on the provisions of
the AS/NZS 4360. The risk assessment results for the financial, technical
and operational, political, and social aspects show several high risk,
moderate risk, and low risk levels based on risk identification studied.