Now showing items 41-50 of 212
Pra Rancangan Pabrik Vanillin dari Oksidasi Isoeugenol Kapasitas 1.640 Ton/Tahun
(UII Yogyakarta, 2008)
Vanillin is one of chemist industries component that most use in food flavor industies, beverages, and pharmaceutical in medic. Vanillin is the primarly component that aromatic vanilla compounds used in the flavouring food, ...
Pra Rancangan Pabrik Acetonitrile dari Asam Asetat dan Amonia Kapasitas 10.000 Ton/Tahun
(UII Yogyakarta, 2008)
Kebutuhan acetonitrile makin meningkat seiring dengan peningkatan industri kimia di Indonesia. Acetonitrile tersebut banyak digunakan sebagai bahan intermediate pada industri fiber, industri parfum, industri pestisida, ...
Pra Rancangan Pabrik Kimia Bioetanol dari Jerami Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2009)
Pre design of Bioethanol factory with 50,000 ton/year capacities are built to decrease Bioethanol import. Bioethanol are made from straw with Hydrolysis and Fermentation process, used an enzyme and yeast as a catalyst. ...
Pra Rancangan Pabrik Liquified Methane Gas (LMG) dari Limbah Cair Tapioka dengan Kapasitas 6.924 Ton/Tahun
(UII Yogyakarta, 2009)
Pra Rancangan Pabrik Liquified Methane Gas (LMG) dari Limbah Cair Tapioka dengan kapasitas 6.924 ton/tahun didirikan untuk memenuhi kebutuhan energi alternatif disamping kebutuhan methane di Indonesia, sehingga mengurangi ...
Pra Rancangan Pabrik Etilen dari Dehidrasi Bioetanol Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2009)
The preliminary design of Ethylene 99,95% with the capacity of 50.000 tons/year was produced from dehydration gas of bioethanol with catalyst zeolit acid. This plant will operate 330 days a year and 24 hours a day, will ...
Pra Rancangan Pabrik Tersier Buthyl Alkohol dari Isobuthylena dengan Kapasitas 60.000 Ton/Tahun
(UII Yogyakarta, 2009)
Preliminary design of TBA with capacity 60.000 ton/year is plant to be built in Cilacap, Central Java in the area of land 3 ha. This chemical plant will be operated for 330 dah/year or 24 hours a day with 200 employees. ...
Pra Rancangan Pabrik Kimia Azodicarbonamide dari Biurea dan Chlorine dengan Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2008)
Preliminary design of azodicarbonamide plant from biurea and chlorine with the capacity of 50.000 ton/year is planned to be built in Cilegon, Banten. This chemical plant will be operatedfor 330 day/year or 24 hours a day ...
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2008)
Preliminary design of Biodiesel with capacity 50,000 ton/year is a plant to be built in Palembang in the area of land 22,050 m². This chemical plant will be operated for 330 day/year or 24 hours aday with 134 employees. ...
Pra Rancangan Pabrik Allyl Chloride dari Propylene dan Chlorine Kapasitas 18.000 Ton/Tahun
(UII Yogyakarta, 2008)
The preliminary plant design of allyl chloride from propylene and chlorine with capacity of 18.000 ton/year is planned to be built in Cilegon, Banten in the area of land 27.945 m². The chemical plant will be operated for ...