• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Kimia Azodicarbonamide dari Biurea dan Chlorine dengan Kapasitas 50.000 Ton/Tahun

    Thumbnail
    View/Open
    01.0 cover.pdf (48.21Kb)
    02 preliminary.pdf (135.3Kb)
    03 daftar isi.pdf (134.8Kb)
    04 abstract.pdf (118.5Kb)
    05.1 bab 1.pdf (172.9Kb)
    05.2 bab 2.pdf (169.9Kb)
    05.3 bab 3.pdf (143.2Kb)
    05.4 bab 4.pdf (1.418Mb)
    05.5 bab 5.pdf (115.7Kb)
    06 daftar pustaka.pdf (121.8Kb)
    Date
    2008
    Author
    Mulyono, Syahri
    Analisi, Joby Himawan
    Metadata
    Show full item record
    Abstract
    Preliminary design of azodicarbonamide plant from biurea and chlorine with the capacity of 50.000 ton/year is planned to be built in Cilegon, Banten. This chemical plant will be operatedfor 330 day/year or 24 hours a day with 150 employees. Raw material needed is biurea of 59834 ton/year and chlorine of 39535 ton/year. The production process will be operated at temperature of 45°C, and pressure about 1 atm using bubble reactor with 85 % convesion of azodicarbonamide. The utiliy consists of 43651 ton/year of cooling water, 13368 ton/year of housing water, while the power of electricity of about 273.82 kWh provided by PLN. This chemical plant also uses generator set as electrical reserve. An economic analysis shows that this chemicalplant needs by fixed capital of about $ 11.961.194,04 i Rp 85.724.114.463, working capital of about Rp 161.263.818.925 + $ 17.433.926,37. The profit before tax is Rp 117.660.201.731,34 per year while the profit after tax is Rp. 100.011.171.471,98 per year. Percentage of return on investment (ROT) before tax is 0,83 %, while that of after tax is 0,95 %. Pay out time(POT)after tax is 2.70 years while that of after tax is 4.3 years. The value of break evek point(BEP)of about 43,10% and shut down point (SDP) of about 25,82 %. Based on the economic analysis, It is concluded that plant design of azodicarbonamide with capacity 50,000 ton/years feasible to be built.
    URI
    http://hdl.handle.net/123456789/3650
    Collections
    • Chemical Engineering [1338]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV