Search
Now showing items 11-20 of 64
Pengolahan Sampah Tetrapack Menjadi Komposit Dengan Metode Hot Pressing
(Universitas Islam Indonesia, 2011)
Aseptic packages are made of several laminated layers, including paper, aluminumand
low-density polyethylene. High amounts of non-wood materials and lack of knowledge on the
manufacturing of the package has made recycling ...
Pra Rancangan Pabrik Hidrogen Peroksida Dari Isopropanol Dengan Proses Oksidasi Kapasitas Produksi 20.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
The hydrogen peroxide plant gives very good prospect, considering the
requirement of hydrogen peroxide in Indonesia which progressively increase.
Preliminary design of hydrogen peroxide plant from isopropanol ...
Pra Rancangan Pabrik Phthalic Anhydride Proses Von Heyden Kapasitas 45.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
Preliminary design of Phthalic Anhydride for 45000 ton/year of capacities
O-xylene and Air (oxygen) oxidation of Pthalic Anhydride with purity 99%. This
plant is planned to be built in Tangerang, Banten. It covers 35000 ...
Pra Rancangan Pabrik Ethanol Dari Pati Singkong Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
Preliminary design of bioethanol plant from starch with capacity 50,000 ton/year is planned to be built in Middle Lampung. This chemical plant will be operated for 330 day/year or 24 hours a day with 149 employees.
Raw ...
Pengolahan Sampah Tetrapack Menjadi Komposit Dengan Metode Hot Pressing
(Universitas Islam Indonesia, 2011)
Aseptic packages are made of several laminated layers, including paper, aluminumand
low-density polyethylene. High amounts of non-wood materials and lack of knowledge on the
manufacturing of the package has made recycling ...
Evaluasi Kinerja (Performance) Katalis R-134 Unit Platformer (Unit 84) Kilang Paraxylene Di PT. Pertamina Refenery Unit IV Cilacap
(Universitas Islam Indonesia, 2011)
Pra Rancangan Pabrik Phthalic Anhydride Proses Von Heyden Kapasitas 45.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
Preliminary design of Phthalic Anhydride for 45000 ton/year of capacities
O-xylene and Air (oxygen) oxidation of Pthalic Anhydride with purity 99%. This
plant is planned to be built in Tangerang, Banten. It covers 35000 ...
Pra Rancangan Pabrik m – Aminophenol Dari Resorcinol Dan Gas Ammonia Dengan Kapasitas 50.000 Ton / Tahun
(Universitas Islam Indonesia, 2011)
Pra Rancangan Pabrik Isopropyle Benzene Dari Benzene Dan Propylene Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
The preliminary design of isopropyle benzene for 50,000 ton/year capacities utilizes benzene of raw material to result isopropyle benzene with purity 99.9% and 99.5% of propylene. The process is alcylation of benzene with ...
Pra Rancangan Pabrik Phenylethyl Alkohol Dari Benzene Dan Ethylen Oxcide Kapasitas Produksi 10.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)
Preliminary design of Phenyethylalcohol with capacity 10.000 ton/year
is plant to be built in Cilacap,Central Java in the area of land 18.625 m2. This
chemical plant will be operated for 330 day/year or 24 hours a day ...