PERENCANAAN DIAGRAM PROSES UNTUK MANAJEMEN SISTEM INFORMASI BAGI PENGGUNA DAN PENYEDIA JASA DI BIDANG USAHA JASA KONTRUKSI PLANNING OF PROCESS DIAGRAM OF INFORMATION SYSTEM MANAGEMENT FOR USERS AND SERVICE PROVIDES IN CONSTRUCTION INDUSTRY
(Universitas Islam Indonesia, 2019-02-19)
One of the authorities for the district / city government in Law No. 2 of 2017 is the
procurement of information systems for construction services, so far the author has not found a
specific information system for users ...
ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN KOMBINASI PENAMBAHAN TENAGA KERJA DAN JAM KERJA EMPAT JAM (Analysis of Project Acceleration Using The Crashing method with a Combination of Additional Labor and Additional Work for Four Hours) (Studi kasus : Proyek Pembangunan Gedung Rumah Sakit Ambon, Maluku)
(Universitas Islam Indonesia, 2019-02-25)
Pengendalian proyek merupakan kegiatan evaluasi biaya, waktu, sumber daya pekerja agar efektif dan efisiensi agar proyek kontruksi dapat terlaksana tepat pada waktunya dan menghindari kerugian. Beberapa cara yang dapat ...
PENGGUNAAN KONSEP EARNED VALUE PADA PROYEK GEDUNG BERTINGKAT BANYAK DI YOGYAKARTA (APPLICATION OF EARNED VALUE CONCEPT AT MULTI-STOREY BUILDING PROJECT IN YOGYAKARTA) (Studi Kasus: Proyek Perkuliahan Twin Building E6 dan E7 Universitas Muhammadiyah Yogyakarta)
(Universitas Islam Indonesia, 2019-02-22)
Selama berlangsungnya proyek konstruksi, beragam masalah dapat timbul dari berbagai tahapan pekerjaan manapun. Adanya masalah akan berdampak pada 3 aspek keberhasilan proyek baik biaya, waktu, maupun mutu. Sehingga jarang ...
PERENCANAAN ULANG PEKUATAN TANAH TEBING KALI CODE MENGGUNAKAN DINDING PENAHAN TANAH TIPE KANTILEVER DAN GEOTEKSTIL (REDESIGN REINFORCEMENT OF CODE RIVERBANK WITH CANTILEVER RETAINING WALLS AND GEOTEXTILE)
(Universitas Islam Indonesia, 2019-01-12)
Dewasa ini perkembangan teknologi dan ilmu pengetahuan semakin meningkat seiring kemajuan jaman, khususnya teknologi dalam bidang Geoteknik. Namun di Indonesia sendiri masih banyak dijumpai permasalahan-permasalahan yang ...
PENGARUH PENGGUNAAN WCO SEBAGAI BAHAN PEREMAJA RAP TERHADAP KARAKTERISTIK CAMPURAN RAP-ASPAL BARU BERGRADASI SUPERPAVE (THE EFFECT OF USING WASTE COOKING OIL AS RAP REJUVENATOR TO CHARACTERISTICS OF RAPNEW ASPHALT WITH SUPERPAVE GRADATION )
(Universitas Islam Indonesia, 2019-03-01)
Recycled pavement requires rejuvenator as a return to the properties lost from RAP asphalt.
One of the rejuvenator is WCO. The purpose of this study was to determine the effect of WCO as a
rejuvenator on the characteristics ...
ANALISIS PENGENDALIAN WAKTU DENGAN MENGGUNAKAN EARNED VALUE CONCEPT NILAI HASIL PADA PROYEK KONSTRUKSI PEMBANGUNAN FISIK PASAR GENTAN SLEMAN (ANALYSIS OF TIME CONTROL ON CONSTRUCTION PROJECT AT THE GENTAN MARKET SLEMAN USING EARNED VALUE CONCEPT)
(Universitas Islam Indonesia, 2019-02-22)
Construction management is very important in project development to achieve maximum results as planned. Project management includes planning, scheduling and controlling projects. Construction projects can be managed well ...
ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN DINDING MENGGUNAKAN PASANGAN BATAKO DAN BATA MERAH PADA PROYEK KONSTRUKSI BANGUNAN PERUMAHAN (COMPARISON ANALYSIS OF COST AND TIME USING CONCRETE BLOCK AND FIRED BRICK IN WALL HOUSING CONSTRUCTION PROJECTS)
(2019-02-27)
Every construction project definitely has a target or goal that must be met both in terms of cost, quality and time. The work is part of the wall of the building work is a very important role for a project of construction ...
PERENCANAAN RUTE TRANS JOGJA MENUJU KAWASAN WISATA KALIURANG (PLANNING OF TRANS JOGJA’S ROUTE TO KALIURANG’S TOURISM AREA)
(Universitas Islam Indonesia, 2019-02-07)
Kemacetan pada Jalan Kaliurang sering terjadi saat akhir minggu dan hari libur. Banyak penduduk maupun wisatawan dari luar daerah yang mengunjungi lokasi wisata tersebut. Salah satu solusi yang dapat dilakukan untuk ...
ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN PEMASANGAN KERAMIK DENGAN MENGGUNAKAN METODE MPDM (ANALYSIS OF LABOUR PRODUCTIVITY ON CERAMIC INSTALLATION USING THE MPDM METHOD) (Studi kasus Proyek rumah kost Sleman, Yogyakarta)
(Universitas Islam Indonesia, 2019-02-19)
Tenaga kerja merupakan faktor yang berpengaruh pada keberhasilan sebuah proyek. Maka diperlukan produktivitas yang tinggi untuk tenaga kerja tukang. Method Productivity Delay Model yaitu metode perhitungan produktivitas ...
INTENSITAS PENGGUNAAN SMARTPHONE DAN KESEJAHTERAAN PSIKOLOGIS PADA MAHASISWA FAKULTAS PSIKOLOGI DAN ILMU SOSIAL BUDAYA UNIVERSITAS ISLAM INDONESIA
(Universitas Islam Indonesia, 2019-01-16)
Penelitian ini bertujuan untuk mengetahui hubungan antara intensitas penggunaan smartphone dan kesejahteraan psikologis pada 127 orang yang merupakan mahasiswa-mahasiswi Fakultas Psikologi dan Ilmu Sosial Budaya, Universitas ...