Pra Rancangan Pabrik Asetanilida Dari Anilin Dan Asam Asetat Kapasitas 32.000 Ton/Tahun
Abstract
Asetanilida plant is designed with a capacity of 32,000 tons / year. Factory is planned to operate in continuous for 330 days in a year and will be established in Cilegon, Banten. required land area as much 32.662 m2 and the total labor force is absorbed as many as 139 people. Manufacture of asetanilida by addisi process at a temperature of 150°C and a pressure of 2.5 atm using a reactor CSTR that occurs is endothermic so as to maintain the operating temperature of the heating media used steam as much as 38.620,5640 kg / hour at 161°C. Required utilities consist of water as much as 21.915,4439 kg / hour, fuel oil 636.301,7261 liters / year and as much as 70 kWh of electrical power from PLN filled with reserve 1 piece generator as much 245,1657 kWh. The plant will need fixed capital investment Rp 101.362.500.332,95 and working capital Rp 11.769.671.370.141,30. This is low risk plant,from economi evaluasi we know that net profit fter taxes about Rp 44.317.326.904,01 / year, with Rate of Return on Investment (ROI) 87,44% , Pay out Time (POT) 1,03 year, Break Event Point (BEP) 55,43 % dsign capacity, Shut Down Point (SDP) 39,67 % design capacity, and Discount Cash Flow (DCF) 14,20 %. Base on this results we have conclution that this Asetanilida from Anilin and Acetat Acid plant with capacity 32.000 tons/year is interesting.
Collections
- Chemical Engineering [1174]