• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Perancangan Pabrik Dodekilbenzena Dari Dodekena Dan Benzena Kapasitas 60.000 Ton/Tahun

    Thumbnail
    View/Open
    01 cover.pdf (99.90Kb)
    03 daftar isi.pdf (561.2Kb)
    04 abstract.pdf (248.5Kb)
    05.1 bab 1.pdf (811.7Kb)
    05.2 bab 2.pdf (669.3Kb)
    05.5 bab 5.pdf (290.7Kb)
    06 daftar pustaka.pdf (518.8Kb)
    Date
    2019-09-20
    Author
    Aji, Ridwan Widinugroho
    Kurniawan, Aditya
    Metadata
    Show full item record
    Abstract
    he design of the dodecylbenzene plant from dodecene and benzene was made to further study the feasibility of the plant to be established. The reason of this design was planned because increasing index of dedocylbenzene that consumed in Indonesia every year beside that, dedocylbenzene that produced in Indonesia still low that made Indonesia importing much dedocylbenzene every year. This dodecylbenzene plant is designed with capacity 60.000 tons/year and operated in 330 days/year and 24 hours/day continuously. The plant was planned to built in Cilacap, Central Java with total of land area 29.700 m 2 and employ 162 employees. The raw materials of the process that needed in this plant were 2634.22 kg/hour 99% benzene (w/w) and 5425,071 kg/hour dodecene 95% (w/w). The process used alkylation reaction with hydrogen fluoride (HF) as an active catalyst. The product that formed was dodecylbenzene with purity 99% (w/w). The energy that required to run this factory was 74,4262 Kwh. This energy was partly supplied from generators and PLN. At this plant, water was used during the process on M-02 and as a utility supplied from the Indian Ocean sea as much as 7099,134 kg/hour. From the economic analisys in this plant produced: fixed capital of Rp. 348.704.395.018,5470 and working capital of Rp. 1.578.236.221.360. While the value of production cost was Rp. 1.696.012.781.070. Based on the economic evaluation, the dodecylbenzene plant has ROI before taxes 44,16% while ROI after taxes 22,08%, POT before taxes 1,9 while POT after taxes 3,3, BEP in amount of 41,47%, SDP 28,21%, and DCFR 6,79%. Based on the values above, can be concluded that this factory was economically attractive and deserves further study.
    URI
    https://dspace.uii.ac.id/handle/123456789/16718
    Collections
    • Chemical Engineering [1338]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV