Search
Now showing items 1-3 of 3
Pra Rancangan Pabrik Biodiesel dari Distilat Asam Lemak Minyak Sawit dan Methanol Kapasitas 80.000 Ton/Tahun
(UII Yogyakarta, 2008)
Preliminary design of Biodiesel with capacity 80,000 ton year is a plant to be built in Deli Serdang, South Sumatera. In the area of land 18.625 m². This chemical plant will be operated for 330 day year or 24 hours a day ...
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2008)
Preliminary design of Biodiesel with capacity 50,000 ton/year is a plant to be built in Palembang in the area of land 22,050 m². This chemical plant will be operated for 330 day/year or 24 hours aday with 134 employees. ...
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton / Tahun
(Universitas Islam Indonesia, 2008)
Preliminary design ofBiodiesel with capacity 50,000 ton/year is aplant
to be built in Palembang in the area ofland 22,050 m2. This chemical plant will
be operatedfor 330 day/year or 24 hours aday with 134 employees
<«, ...