Browsing Industrial Engineering by Author "13522203 Adnan Jati Satria"
Now showing items 1-1 of 1
-
Reducing Non-Productive Time (NPT) In The Seven Well Drilling Project On The North Beach Of Javafrom PT Multi Jaya Tehnik
13522203 Adnan Jati Satria (Universitas Islam Indonesia, 2020)Oil and gas as fuel are still the main needs for human needs on energy, and to obtain oil or natural gas, the drilling process should be executed. The drilling process is an expensive investment and requires a very high ...