Browsing Chemical Engineering by Subject "Pati Singkong"
Now showing items 1-5 of 5
-
Pra Rancangan Pabrik Ethanol Dari Pati Singkong Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)Preliminary design of bioethanol plant from starch with capacity 50,000 ton/year is planned to be built in Middle Lampung. This chemical plant will be operated for 330 day/year or 24 hours a day with 149 employees. Raw ... -
Pra Rancangan Pabrik Ethanol Dari Pati Singkong Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)Preliminary design of bioethanol plant from starch with capacity 50,000 ton/year is planned to be built in Middle Lampung. This chemical plant will be operated for 330 day/year or 24 hours a day with 149 employees. Raw ... -
Pra Rancangan Pabrik Ethanol Dari Pati Singkong Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)Preliminary design of bioethanol plant from starch with capacity 50,000 ton/year is planned to be built in Middle Lampung. This chemical plant will be operated for 330 day/year or 24 hours a day with 149 employees. Raw ... -
Pra Rancangan Pabrik Ethanol Dari Pati Singkong Kapasitas 50.000 Ton/Tahun
(Universitas Islam Indonesia, 2011)Preliminary design of bioethanol plant from starch with capacity 50,000 ton/year is planned to be built in Middle Lampung. This chemical plant will be operated for 330 day/year or 24 hours a day with 149 employees. Raw ... -
Pra Rancangan Pabrik Fuel Grade Etanol Dari Pati Singkong Kapasitas 5.000.000 Liter / Tahun
(Universitas Islam Indonesia, 2011)Preliminary plant design of Fuel Grade Ethanol with capacity 5.000.000 litre/year will be built in Menggala, North Lampung, in the area of land 3.390 m2. This chemical plant will operate during 330 days/year or 24 hours ...