• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 3rd CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 3rd CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Implementasi Konsep BIM 4D dalam Perencanaan Time Schedule dengan Analisis Resources Levelling

    Thumbnail
    View/Open
    64-73 (IMPLEMENTASI KONSEP BIM 4D DALAM PERENCANAAN TIME SCHEDULE DENGAN ANALISIS RESOURCES LEVELLING).pdf (1.505Mb)
    Date
    2022-07-20
    Author
    Rachmawati, Septiana
    Abma, Vendie
    Metadata
    Show full item record
    Abstract
    The development of information technology in the construction sector is growing rapidly. Virtual building technology with a computing system was developed with the principle of Building Information Modeling (BIM), capable of creating 3D modeling in the construction sector (architecture, structure and MEP). Naviswork is an application that helps in the design process and scheduling an architectural, structural, mechanical, electrical and plumbing work that works on a project. The features found in Naviswork are clash detection, timeliner, animator, quantification workbook, etc. The construction of the Faculty of Health Sciences University Jendral Soedirman building has used the BIM concept by making 3D models with Tekla Structures. In previous studies, the project has been scheduled using the Barchart method. In this study, the PDM (Precedence Diagram Method) method will be used so that the scheduling is more specific. From the results of the study, it was found that the implementation of BIM on the Naviswork software in the Time Schedule of project implementation can help simulate project implementation and detect if there is a clash between work items. The results of Naviswork also greatly affect the 3D Model and Time Schedule of the MS Project. The results of this study get the difference in the duration of the implementation due to differences in the use of methods in project scheduling, namely PDM (Precedence Diagram Method) and Barchart where the PDM method is more specific work relationships and there are restrictions on the number of resources.
    URI
    http://hdl.handle.net/123456789/56121
    Collections
    • 3rd CE REFORM [22]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV