Show simple item record

dc.contributor.authorPratama, Rizky Allam Zandriyan
dc.contributor.authorNugraheni, Fitri
dc.date.accessioned2025-06-03T05:28:37Z
dc.date.available2025-06-03T05:28:37Z
dc.date.issued2022-01-24
dc.identifier.isbn978-602-450-716-9
dc.identifier.urihttp://hdl.handle.net/123456789/56113
dc.description.abstractProductivity is a fundamental factor that influences the performance of competitiveness in the construction industry. Increasing the level of productivity relates to the time needed to complete the work and will directly affect the amount of costs needed. Particularly from the reduction in costs consumed by construction workers. The costs allocated to these workers contribute to the auction / tender process and during the implementation of the project, therefore information about labor productivity is very important to be examined in detail. One way to get field productivity value is by using method productivity delay model. In this study there are 5 labor that observed. Observation take 3 session .first session held before 12 pm, second session held after 12 pm. And third session take randomly beetwen that 2 session. Based on the research that has been done, the results of the analysis are as follows. Field labor Productivity is 2,64 m2/hour and ideal labor productivity is 3,659 m2/hour. Comparation of field productivity and unit price analysis from PermenPUPR-28-2016 is 23,936 times. Biggest delay factor affect productivity is material factor.en_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectProductivity, Labor, Auto Claved Aerated Concrete, MPDMen_US
dc.titleAnalisis Produktivitas Tenaga Kerja Pada Pekerjaan Bata Ringan Dengan Menggunakan Method Productivity Delay Model (MPDM)en_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record