• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 2nd CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 2nd CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Bata Ringan Dengan Menggunakan Method Productivity Delay Model (MPDM)

    Thumbnail
    View/Open
    Proceeding The 2nd CeReform Final-160-170.pdf (368.3Kb)
    Date
    2022-01-24
    Author
    Pratama, Rizky Allam Zandriyan
    Nugraheni, Fitri
    Metadata
    Show full item record
    Abstract
    Productivity is a fundamental factor that influences the performance of competitiveness in the construction industry. Increasing the level of productivity relates to the time needed to complete the work and will directly affect the amount of costs needed. Particularly from the reduction in costs consumed by construction workers. The costs allocated to these workers contribute to the auction / tender process and during the implementation of the project, therefore information about labor productivity is very important to be examined in detail. One way to get field productivity value is by using method productivity delay model. In this study there are 5 labor that observed. Observation take 3 session .first session held before 12 pm, second session held after 12 pm. And third session take randomly beetwen that 2 session. Based on the research that has been done, the results of the analysis are as follows. Field labor Productivity is 2,64 m2/hour and ideal labor productivity is 3,659 m2/hour. Comparation of field productivity and unit price analysis from PermenPUPR-28-2016 is 23,936 times. Biggest delay factor affect productivity is material factor.
    URI
    http://hdl.handle.net/123456789/56113
    Collections
    • 2nd CE REFORM [24]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV