    Pra Rancangan Pabrik Dibutyl Phthalate dari Phthalic Anhydride dan N-butanol dengan Katalis Asam Sulfat Kapasitas 10.000 Ton/Tahun

    Thumbnail
    View/Open
    COVER (OK).docx (82.21Kb)
    LEMBAR PERNYATAAN KEASLIAN HASIL (OK).docx (694.6Kb)
    LEMBAR PENGESAHAN PEMBIMBING (OK).docx (369.5Kb)
    LEMBAR PENGESAHAN PENGUJI (OK).docx (641.3Kb)
    KATA PENGANTAR (OK).docx (41.38Kb)
    DAFTAR ISI, DAFTAR TABEL, DARTAR GAMBAR (OK).doc (34.5Kb)
    ABSTRACT (OK).docx (17.25Kb)
    ABSTRAK (OK).docx (17.58Kb)
    BAB I PENDAHULUAN (OK) .docx (34.85Kb)
    BAB II PERANCANGAN PRODUK (OK).docx (87.65Kb)
    BAB III PERANCANGAN PROSES (OK).docx (97.94Kb)
    BAB IV PERANCANGAN PABRIK (OK).docx (2.300Mb)
    BAB V PENUTUP (OK).doc (70.5Kb)
    DAFTAR PUSTAKA (OK).docx (18.42Kb)
    LAMPIRAN REAKTOR (OK).docx (69.63Kb)
    LAMPIRAN PEFD (OK).docx (440.7Kb)
    Date
    2017-12-11
    Author
    Irsyad, Dwiky Muhammad
    Saputra, Farid
    Metadata
    Show full item record
    Abstract
    The preliminary design of dibutyl phthalate for 10,000 ton/year capacities utilizes methanol of raw material to result dibutyl phthalate with purity 99%. The process is reaction of phthalic anhydride and n-butanol with sulfuric acid catalyst to produce dibutyl phthalate in fixed bed reactor at 303 K and 1 atmosphere. This plant is included low risk plant because processes at low operation condition (temperature and pressure), another raw material is obtained. This plant is planned to be built in Gresik, East Java, It covers 10000 m2 of land and needs 163 employees. It works continually for 24 hours/day and 330 days/year. Process unit requires 3310.7738 ton/year of water, whereas utility unit needs 160.1704 kg/hour water for cooling, 2562,5 kg/hour water for domestic, 1.3566 kg/hour of steam, 167.964 kW of electricity, 12.144 kg/hour of fuel oil and 222,769 kg/hour of pressured air. The economic evaluation shows Fixed Capital of Rp. 96.473.058.451 + US$ 7.188.752,49, Working Capital of Rp. 37.912.467.684 + US$ 2.825.072,11, Profit before taxes Rp. 21.525.041.424,77, Profit after taxes Rp. 18.726.786.039,55. Feasibility studies results in Break Even Point (BEP) of 44% (BEP requisite in Indonesia 40% - 60 %), Shut Down Point (SDP) of 20%, and Discounted Cash Flow Rate of Return (DCFR) of 25%. Meanwhile Return On Investment Before Taxes (ROIb) of 24% (ROIb requisite for low risk plant > 11%) and Return On Investment After Taxes (ROIa) of 20%. along with Pay Out Time Before Taxes (POTb) of 3 years (POTb requisite for high risk plant < 2 years) and Pay Out Time After Taxes (POTa) of 3,3 years in a row. Based on this economic evaluation, it can be concluded that dimethyl ether Plant of 10,000 ton/year is economically feasible.
    URI
    https://dspace.uii.ac.id/handle/123456789/4857
    Collections
    • Chemical Engineering [1334]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV