• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 5th CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 5th CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perbandingan realisasi biaya pelaksanaan tehadap rab berbasis bim 5d pada pekerjaan struktural bangunan

    Thumbnail
    View/Open
    16. Julieta_Perbandingan realisasi biaya pelaksanaan tehadap rab berbasis bim 5d pada pekerjaan struktural bangunan.pdf (669.4Kb)
    Date
    2023-07-18
    Author
    Salsabila, Julieta
    Abma, Vendie
    Metadata
    Show full item record
    Abstract
    Planning estimate cost for a project in these days is dominated by conventional methods. This results in numerous mistakes, inaccuracies, and waste material in project planning. Whereas, if the project’s funding have troublesome or missing, it will inflict obstacles while running the project. Utilizing the BIM method can make it simpler to eliminate errors in project planning since flaws in planning can be detected at the beginning, it can help the planners and also to avoid mistakes during implementation. BIM 5D is capable for making fast estimate on a variety of complex issues can be done effectively and efficiently. This study aims to obtain a cost estimate of structural work (rebar and concrete) using 5D BIM concept used by Revit software, then compare with actual construction cost and the estimated cost construction from project data used by Excel software. This will produce volume and cost margins to find out the difference in total costs between BIM 5D, data estimated project and actual implementaion. This research produces a cost estimate based on BIM 5D showing the price of materials needed for rebar and concrete structures is Rp 82.377.824, construction cost estimated from project data shows the price is Rp 117.847.403 and the actual cost shows the price is Rp 90.346.000. Using BIM 5D method can efficiently reduce material volume and estimated costs in construction projects, so the fact that BIM 5D concept can minimize overlap for construction planning can be more precise, able to optimize the estimated costs obtained.
    URI
    http://hdl.handle.net/123456789/45516
    Collections
    • 5th CE REFORM [32]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV