Analisis Perbandingan Biaya Pekerjaan Pelat Lantai Antara Metode Steeldeck Dan Konvensional (Studi Kasus : Rusunawa Jongke) Cost Comparison Analysis of Slab Works Between Steeldeck and Conventional Method (Case Study : Rusunawa Jongke)
Abstract
The development of construction services in Indonesia is growing rapidly. construction companies trying to win the competition by improved the products or services, so they can give satisfaction for customers. One of them use Steeldeck for materials in the slab to provide benefits of cost and time. The purpose of this research was to determine the cost comparison of the slab between slab conventionally work with slab using steeldeck and wiremesh. In this research work analyzes the slab refers to SNI 7394-2008 about the coefficient of materials and workers. Price analysis is obtained based on the price of materials and labor costs in the region of Yogyakarta in 2016, and the price of analysis Steeldeck and Wiremesh obtained from CV.LightGroup Indonesia. And after that, can determined the Bugdet plan. The results of analysis, obtained the total cost of the slab work consisting of 5 floors with a conventional system of Rp 1.635.110.421,00 and the slab work by using wiremesh and Steeldeck Rp 1.412.617.975,00 From the analysis results, obtained comparison of cost Rp 222.492.446,00 that slab work using Steeldeck is 9.3% more economical than conventional slab work.
Collections
- Civil Engineering [4205]