• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Formaldehyde Dari Metanol Dan Udara Dengan Kapasitas 5.000 Ton / Tahun

    Thumbnail
    View/Open
    08521007 Linda Devi Yuniarsih-08521019 Sari Sekar Ningrum.pdf (3.139Mb)
    Date
    2012
    Author
    Linda Devi Yuniarsih
    Sari Sekar Ningrum
    Metadata
    Show full item record
    Abstract
    The Formaldehyde plant gives very good prospect, considering the requirement of Formaldehyde in Indonesia which progressively increase. Preliminary design of Formaldehyde plant from methanol and air is planned to built in Bontang, the province of East Borneo, in the area of land of 10,158 m2 with production capacity 5,000 tons/year. This chemical plant will be operated for 330 days or 24 hours a day with total 145 employees. Raw materials needed are methanol 2,832.2435 tons/year and air 3,371.8378 tons/year. The production process will be operated at temperature 300°C and pressure about 1,5 atm using a fixed bed reactor, as a reactor cooler is used Dowterm A. The convert reaction is 69.74%, resulting product formaldehyde, water, and methanol. This plant are needed 3,701.6061 kg/hour of water from Sangatta river which proceced in utility unit, 857.6794 kg/hour of steam, and 120 kWh of electricity power provided by PLN and also need a generator as reserve. A parameter of appropriatness uses an economic analysis with total capital investment Rp 24,387,814,349 consisted of Rp 17,293,252,067 as a Fixed Capital Investment, and Rp 5,085,051,486 as a Working Capital. Total Cost Rp 24,387,814,349 and Annual Sales Rp 36,800,000,000 thus it can get profit Rp 12,412,185,650 before taxes, and Rp 6,206,092,825 after taxes. A count result of parameter after taxes is percentage of Return On Investment (ROI) 36 %, Pay Out Time (POT) 2.18 year after taxes, Discounted Cash Flow (DCF) 18.70 %, Break Event Point (BEP) 44.43 %, while Shut Down Point (SDP) 27.82 %. From the analyses above it showed that the result was satisfied so the plant are interesting and appropriate to build.
    URI
    https://dspace.uii.ac.id/handle/123456789/37522
    Collections
    • Chemical Engineering [928]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV