• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Asam Asetat dari Asetaldehid dan Udara Kapasitas Produksi 15.000 Ton/Tahun

    Thumbnail
    View/Open
    01.0 cover.pdf (52.49Kb)
    02 preliminary.pdf (206.2Kb)
    03 daftar isi.pdf (187.1Kb)
    04 abstract.pdf (130.2Kb)
    05.1 bab 1.pdf (196.5Kb)
    05.2 bab 2.pdf (197.0Kb)
    05.3 bab 3.pdf (599.3Kb)
    05.4 bab 4.pdf (2.366Mb)
    05.5 bab 5.pdf (135.2Kb)
    06 daftar pustaka.pdf (106.7Kb)
    Date
    2011
    Author
    Usmawati, Elfira
    Metadata
    Show full item record
    Abstract
    Acetic Acid Plant of acetaldehyde and the air is designed with a capacity of 15,000 tons/year and is planned to operate continuously founded in Saht, Central Java with an area of 26,000 m² and is designed to work for 330 days a year and 24 hours per day. Background of the establishment of this factory is to meet the needs of Acetic Acid in Indonesia. Preparation of Acetic acid using a cetaldehyde oxidation process, through several stages of the process as follows: raw material a cetaldehyde and air hubbies berkatalis reacted in a reactor at a temperature of 65ºC Manganese Acetate pressure of 10 atm with 90% conversion. Products of the gas phase reactor will be separatedby water in the scrubber at a temperature of 65ºC and pressure of 10 atm and in the recycle to the reactors. Products under the reactor were poured into the distillation tower I to purify the acetic acid. The yield on distillation menaara I in the recycle to the reactor and flowed to the bottom of the distillation tower 11 to obtain acetic acid purity of 99.8% and 0.2% water. Acetic Acid plant utilities to include water make-up of 49,769,2X29 kg/h is taken from the Bengawan Solo river, 542 kW electricity, compressed air as much as 579.73 kg/hour, fuel as much as 29.3163 kg/hour. Results of economic analysis shows that these Acetic Acid plant requires fixed capital (Fixed Capital Investment) of U.S. $ 20,412,492.54 and working capital (Working Capital Investment) of U.S. $5,881535.92 with aprofd before tax of tip 40,774,904,173,32 and profit after tax of Rp. 20,287,452,086.66. The factory has a Return on Investment (ROI) before taxes and after taxes 19.98% 9.99%; Pay Out Time (POT) before tax 3.46 years and after tax 5.56 years, Shut Down Point (SDP) 1139% and Break Even Point (BFP) 43,23%, with Discounted Cash Flaw Rate (DCFR) 11,98%. Based on the above data, it can be concluded that Acetic Acidplant is worth consideringfor its establishment.
    URI
    http://hdl.handle.net/123456789/3688
    Collections
    • Chemical Engineering [1338]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV