• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Garment Kemeja Lengan Panjang Pria Dewasa dengan Bahan Tekstil Bermotif Batik dengan Kapasitas Produksi 310.440 Pcs / Tahun

    Thumbnail
    View/Open
    01521064 Achmad Fukhuludin.pdf (12.32Mb)
    Date
    2007
    Author
    Achmad Fukhuludin
    Metadata
    Show full item record
    Abstract
    Preliminary plant design for men’s long sleeve of exclusive batik with total capacity 310.440 picces/years istargetedTo explore the batik need as a original product of Indonesia. The factory will be build in Yogyakarta at Jl.Magelang km 9, in Sleman on the piece area 3.498 m². The factory will be operated for 24 hours/day or 330 day a year with total of 202 employees. The machine is 63 sewing machine, 3 cutting machine, 3 automatic speading machine, 5 fussing machine, and 1 labeling machine, from the economic analisis. Raw material needed are cotton of about70% and polyester 30%. The factory will be convered by a capital investment of about Rp.5.654.605.000,00 and working capital of about Rp.9.424.970.732,00, return of capital of Pay Out Time (POT) will return in 4 years 9 month, then the price ofeach price product is Rp.49.749,03. This factory has profit Rp.2.999.650.094,00 in a year. The result of an economics analysis showed the Break Event Point (BEP) of factory is achieved 51,77%, Return ofInvestment (ROI) after taxes is achchieved 20,13, and Pay Out Tme (POT) after taxes for about 4,9 years that means the factory have low risk. Based on the above factors can be concluded that plan design for men's long sleeve with shirt the Batik motif plant of Cotton and Polyester with production of capacity 310.440 pieces/years feasible to be built.
    URI
    https://dspace.uii.ac.id/123456789/26201
    Collections
    • Chemical Engineering [1334]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV