dc.description.abstract | Preliminary plant design of a 100% cotton spinning mill with capacity
50.000 spindels is planned to be built in Ranca Ekek, the province of Jawa Barat
on the area 23.250 m². The factory will be operated for 24 hours a day or 360
days/year with total employess 239 persons. Target production of the factory for
about 5.100.677,4 kg kg/years and raw materials (cotton fibre) needed
5.928.466,15 kg kg/years.
Product of the yarns is planned to have yarn number Nei 40. The need of
machines include 2 line Blowing machine, 17 unit carding machines, 6 unit
drawing I machines, 6 unit drawing II machines, 6 unit flayer machines, 74 unit
Ring Spinning machines and 15 unit winding machines.
The factory will be convered by a capital investment of Rp.74.981.436.410,00 and
the working capital Rp. 103.049.887600,00 per years. From an economic analysis
showed that the value of break event point of the factory is 42.3 %, Return On
ivestment 32.82% before tax and 31.2% after tax. The capital investment will
return in 3 years, 2S months.
Based on the factors such as the easy of supply of the raw materials
(cotton), and increased the of the yarn by the weaving factor}' and consideration of
an economic analysis, then, plan design of the spinning mill visible to be built. | en_US |