One of the methods for increasing the healthiness of water consumer is by
applyinga good water management. This planning's goal is to improve the quality
of drinking water service which conducted by PDAM Way Rilau to the people of
Telukbetung - Panjang, with the improvement in piping system from 40% to 80%
in 2014.
The result of hydrolic analysis using Epanet 2.0 programme on the water
service system in Telukbetung - Panjang reveal that the condition in 2004, with
the operation for 7 (seven) hours a day and debit as much as 243,58 lt/sec, is not
appropriate to satisfy the people demand. As the result of low water pressure at
some nodes, in certain hours the water doesn't flow and a water flow scheduling
must be employed. This condition doesn't satisfy the PDAM customer.
Base of this planning is by optimizing the existing condition, so that
distribution operation is extended from 7 (seven) hours to 24 (twenty four) hours
each day. Optimizing the existing system improves the water flow to 274,34 lt/sec
capacity. Under this condition, water can be delivered to 145.207 people in 2004,
increasing from 40% to 70%. It means, the PDAM customer's need can be
completed, as well as the new subscribers application.
The next step is planning for water service in Telukbetung - Panjang for
2014. The population forecast is done with Geometric method, resulting the
population of 235.097 people. With the service target of 80% and 24 hours
operation, Telukbetung - Panjang needs water supply as much as 1.351, 43 lt/sec.
The development plan of Telukbetung - Panjang water system involves the
installation of parallel pipes at some existing distribution network, with the
purpose of obtaining the required water debit with sufficient water pressure.