    ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN JAM KERJA OPTIMUM (Studi Kasus : Proyek Pembangunan Gedung Kantor Kecamatan Kedawung, Jl. Sragen – Kedawung, Kecamatan Kedawung, Kabupaten Sragen, Jawa Tengah)

    Thumbnail
    View/Open
    01 cover.pdf (121.2Kb)
    02 Preliminari.pdf (1.142Mb)
    03 Daftar isi.pdf (528.2Kb)
    04 abstract.pdf (68.92Kb)
    05. 1 bab 1.pdf (383.8Kb)
    05. 2 bab 2.pdf (453.8Kb)
    05. 3 bab 3.pdf (1.551Mb)
    05. 4 bab 4.pdf (369.9Kb)
    05. 5 bab 5.pdf (3.450Mb)
    05. 6 bab 6.pdf (155.4Kb)
    06 daftar pustaka.pdf (138.4Kb)
    07. 1 Lampiran.pdf (5.517Mb)
    08 naskah publikasi.pdf (857.5Kb)
    Date
    2019-07-31
    Author
    Sektiawan Riesli Nugroho, 13511250
    Metadata
    Show full item record
    Abstract
    Abstract: Projects are not always on time in their planning, they often encounter delays. Many factors are factors that delay such as the road to difficult projects, uncertain climates and much more. To anticipate the delay there are several alternative options that can be used. Use more productive tools, increase the number of workers, and choose more efficient materials and methods. In this study using additional working hours (overtime) with alternative choices, 1 hour, 2 hours and 3 hours overtime. The purpose of this study is to find out how much additional working hours (overtime) are optimal in terms of cost and time. The results of the analysis carried out on the Kedawung Sub-District Office Building Project Project were obtained by the addition of 3 hours of work with the fastest duration of 77 day with a work effectiveness value of 83.7218% with a decrease in effectiveness of 16.2782 and direct costs obtained are Rp 356.962.904,37 and indirect costs of Rp. 25.156.905,66 with a ratio of 1,04.
    URI
    http://hdl.handle.net/123456789/15611
    Collections
    • Civil Engineering [4889]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV