• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Industrial Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Industrial Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Reducing Non-Productive Time (NPT) In The Seven Well Drilling Project On The North Beach Of Javafrom PT Multi Jaya Tehnik

    Thumbnail
    View/Open
    13522203 Adnan Jati Satria.pdf (3.703Mb)
    Date
    2020
    Author
    13522203 Adnan Jati Satria
    Metadata
    Show full item record
    Abstract
    Oil and gas as fuel are still the main needs for human needs on energy, and to obtain oil or natural gas, the drilling process should be executed. The drilling process is an expensive investment and requires a very high cost. Drilling cost is critical factor in determining the financial returns from an oil and gas investment. One of the factors that determines the cost efficiency of drilling is reducing the Non-Productive Time (NPT) or downtime. Downtime is an undesirable outcome in any operation. The NPT makes the high cost of drilling process. The higher the NPT,the more expensive the drilling costs will be. Drilling optimization is the key to reduce Non-Productive Time /NPT. There are many factors that cause NPT include natural factors, technical factors, human resources, and availability of equipment. For this reason, this study will examine the NPT in the drilling project undertaken by PT Multi Jaya Tehnik (MJT). This research is a quantitative study with cross sectional method which was carried out on 7 oil drilling projects by PT MJT. The data collection was carried out during the internship in July 2019. The research finds that from the 7 well drilling projects of PT. MJT, the result shows from the total operational time, how of 4.144,76 hours is lost due to NPT, of which 2420,25 hours is NPT ER. By reducing NPT via various means on focus of the equipments which PT. MJT provides, the projects can reduce loss time caused by NPT noticeable while also improving PT. MJT quality of service as an equipment rental company.
    URI
    https://dspace.uii.ac.id/123456789/30113
    Collections
    • Industrial Engineering [2908]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV