• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Industrial Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Industrial Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Maintenance Project Management Analysis Of Hybrid Power Plant Wind Turbine Unit

    Thumbnail
    View/Open
    01. Cover.pdf (118.8Kb)
    02. Preliminari.pdf (945.5Kb)
    03. Daftar Isi.pdf (96.65Kb)
    04. Abstrak.pdf (82.56Kb)
    05.1 bab 1.pdf (111.9Kb)
    05.2 Bab 2.pdf (412.0Kb)
    05.3 bab 3.pdf (363.1Kb)
    05.4 bab 4.pdf (843.9Kb)
    05.5 Bab 5.pdf (167.0Kb)
    05.6 Bab 6.pdf (159.6Kb)
    06. Daftar Pustaka.pdf (281.4Kb)
    07.1 lampiran 1.pdf (153.8Kb)
    07.2 lampiran 2.pdf (153.4Kb)
    Date
    2017
    Author
    Dewanta, Aji Kurnia
    Metadata
    Show full item record
    Abstract
    This research is focused on the performance of maintenance process on wind turbine 1 KW at Hybrid Power Plant (PLTH Bayu Baru) and measurement of the optimal of human resource involved. optimal of human resource of maintenance process is determined by analyzing the network diagram that has been developed by Project Evaluation Review Technique (PERT). By analyzing the critical path and the slack duration, the labor allocation has been conducted in activity 18 and 20 which are replaced 7 technicians with 7 helpers and 4 technicians with 4 helpers. Moreover, the crashing method also has been elaborated after te number of labor already known. By crashing method by added 1 hour to overtime the completion time, the duration of the maintenance process can be shortened from the normal maintenance data from 65,1 hours became 54,1 hours. The probability of the project are finished in 54,1 hours is 0,03%. Therefore, the total cost of maintenance also increased from Rp 3.629.277,38 became Rp 4.648.975,33. The total maintenance cost for this project has gap Rp1.184.697,94 which came from the calculation of crash cost, cost slope and labor allocation for the maintenance project of wind turbine 1 KW. With the probability of 0,03%, this project are available to complete the project in 54,1 hours by additional cost Rp1.184.697,94.
    URI
    https://dspace.uii.ac.id/123456789/61685
    Collections
    • Industrial Engineering [2908]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV