EVALUASI WAKTU DAN BIAYA PROYEK PEMBANGUNAN TK SULTAN AGUNG MENGGUNAKAN METODE EARNED VALUE CONCEPT (TIME AND COST EVALUATION OF SULTAN AGUNG KINDERGARTEN CONSTRUCTION PROJECT USING EARNED VALUE CONCEPT METHOD)
(Universitas Islam Indonesia, 2018-05-08)During construction phase, inaccurate productivity due to improper project management is now frequently happened. Unpredictable costs, prolonged construction period as well as poor construction quality become an issue that ... -
EVALUASI WAKTU PROYEK PADA PROYEK PEMBANGUNAN EKSTENSI GEDUNG MAGISTER PSIKOLOGI FPSB UII
(Universitas Islam Indonesia, 2019-08-30)In the course of implementing a construction project it is deemed necessary to control the project so that what is carried out is appropriate to the time of planning. with project control, the execution of work can be ...