Show simple item record

dc.contributor.advisorFitri Nugraheni, ST.,M.T.,Ph.D
dc.contributor.authorTrisna Novty, 13511314
dc.date.accessioned2018-02-23T10:07:38Z
dc.date.available2018-02-23T10:07:38Z
dc.date.issued2018-02-21
dc.identifier.urihttps://dspace.uii.ac.id/handle/123456789/5815
dc.description.abstractProyek pembangunan Jalan Jalur Lintas Selatan Bugel-Gririjati Melakukan pekerjaan Galian dan timbunan dengan volume Galian sebesar 6057,75 m3 dan volume timbunan sebesar 52528,94 m3. Pekerjaan galian timbunan dilakukan dengan alat excavator, dump truck dan bulldozer. Penelitian ini bertujuan untuk mengetahui kombinasi alat berat yang optimal dari segi biaya dan waktu pelaksaan pekerjaan proyek. Untuk mendapatkan dump truck yang efisien pada kombinasi alat berat pada pekerjaan galian dan timbunan tanah dilakukan dengan menghitung alternatif. Ada 3 alternatif yang dihitung dengan kombinasi alat beratnya excavator, dump truck dan bulldozer. Sebelum melakukan analisis terdahulu mengumpulkan data dengan cara observasi langsung ataupun wawancacara. Setelah data terkumpul kemudian menghitung produktivitas masing-masing alat berat, menghitung jumlah kebutuhan dump truck berdasarkan kapasitas produksinya, menghitung biaya harga sewa alat berat, dan menghitung biaya total pekerjaan galian. Hasil alternatif yang didapat kemudian dibandingkan dengan alternatif pertama sebagai perbandingan untuk mendapatkan dump truck yang efisien pada kombinasi alat berat. Didapat alternatif ke 2 untuk dump truck yang paling efisien menglami kenaikan waktu sebesar 9,09 % dan pengurangan biaya sebesar -3,25 % dari alternatif 1 dan pada alternatif ini alat berat dump truck tidak mengalami idle time sehingga semua dump truck dapat bekerja. Dengan kombinasi alat berat yang digunakan yaitu 1 unit excavator, 3 unit dump truck dan 1 unit bulldozer. The road development of south Bugel-Girijati project doing excavation and heap work with an embankment volume of 6057,75 m3 and an embankment deposit of 52528,94 m3. Excavation work is done by excavator, dump truck and bulldozer. This study aims to determine the optimal combination of heavy equipment in terms of cost and time of project implementation. For an efficient of dump truck on combination of heavy equipment on excavatioon and landfill is done by calculating alternatives. There are 3 alternatvites that suitable for the combination of excavator, dump truck and bulldozer. Before performing the previous analysis collect data by direct observation or interview. After the data by collacected then calculate the productivity of each machine, calculate amoung of dump truck need based on its production capacity, calvulate the total cost of excavation work. Then, the result of those alternatives will have compared with the 1st alternative as a comparison to obtain the efficient of dump truck on combination of the heavy equipment. This study showed that the second alternatives for dump truck is the most efficient with reducing of the time as much as 6,67 % and reducing the cost about -3,25 %. The other advatantages was obtained the reducing idle time. Where as the combination of 1 excavators, 3 dump truck and bulldozers as heavy equpment..en_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectEfisienen_US
dc.subjectKombinasien_US
dc.subjectAlat Beraten_US
dc.subjectExcavatoren_US
dc.subjectDump Trucken_US
dc.subjectBulldozeren_US
dc.subjectAlternatifen_US
dc.subjectEfficiencyen_US
dc.subjectCombinationen_US
dc.subjectHeavy Equipmenten_US
dc.subjectExcavatoren_US
dc.subjectAlternativeen_US
dc.titleANALISIS EFISIENSI DUMP TRUCK PADA KOMBINASI ALAT BERAT PEKERJAAN GALIAN DAN TIMBUNAN TANAH (ANALYSIS OF DUMP TRUCK EFFICIENCY IN HEAVY COMBINATION EQUIPMENT ON CUT AND FILL WORK)en_US
dc.typeUndergraduate Thesisen_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record