• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 9th CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 9th CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Eksplorasi quantity take off (QTO) dan dampak terhadap biaya berbasis 5D BIM

    Thumbnail
    View/Open
    55_Eksplorasi quantity take off (QTO) dan dampak terhadap biaya berbasis 5D BIM.pdf (1.277Mb)
    Date
    2025-07-31
    Author
    Atmajaya, Wirayuda
    Abma, Vendie
    Metadata
    Show full item record
    Abstract
    The digital era has driven significant transformation in the construction industry, particularly in addressing cost estimation inaccuracies that often lead to overruns. This study investigates the implementation of 5D Building Information Modeling (BIM) as an innovation in construction cost planning by integrating Autodesk Revit for 3D modeling with Bexel Manager for real-time cost analysis. A case study was conducted on the Tanjungkarang Polytechnic Hall Building project, valued at IDR 8.4 billion and modeled at Level of Development (LOD) 350. A collaborative workflow was employed by converting Revit-based geometry into IFC4 format for 5D analysis in Bexel Manager. The cost data were based on AHSP 2022 and regional SHBJ standards to ensure national compliance. The 5D BIM implementation resulted in a total project cost of IDR 7.344 billion, reflecting a 12.80% cost reduction (IDR 1.077 billion) compared to conventional estimation methods (data project). Major cost variances were found in earthworks (18.55%) and roof structures (34.33%), primarily due to discrepancies in quantity take-off volumes. These differences stemmed from varying levels of detail and modeling perspectives. The system also automatically detected 24 clashes among 330 elements, highlighting issues such as an unmodeled excavation task, misinterpreted foundation task components, and insufficient detail in reinforcement and roofing. Overall, 5D BIM significantly improved accuracy, reduced human error, and demonstrated strong potential to support Indonesia’s digital transformation in construction planning.
    URI
    http://hdl.handle.net/123456789/57374
    Collections
    • 9th CE REFORM [51]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV