• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 9th CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 9th CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perencanaan anggaran biaya pada pekerjaan struktur jembatan berbasis 5D BIM

    Thumbnail
    View/Open
    12_Perencanaan biaya pada pekerjaan struktur jembatan berbasis 5D BIM.pdf (485.1Kb)
    Date
    2025-07-31
    Author
    Mubarak, Syahrul
    Abma, Vendie
    Metadata
    Show full item record
    Abstract
    The construction sector in Indonesia faces fundamental issues related to productivity, financial aspects, and technology adoption, which are exacerbated by a low level of digitalization. Building Information Modeling (BIM) has produced a solution, particularly in enhancing the accuracy of cost calculations that are essential for budget control and project management. This study focuses on investigating the implementation of the fifth dimension (5D) BIM to cost planning of structural work. The chosen case study is the Planjan-Baron-Tepus New Road Bridge Project in Gunung Kidul Regency, Yogyakarta, with the targeted output being a more accurate and efficient Cost Budget Plan (RAB) for the concrete bridge structure work. The steps undertaken began with modeling 2D re-drawings into a 3D model using Tekla Structures software, which is already integrated with Vico Office software as the 5D (cost estimate) processing software. This integration eliminates the need for IFC files. The research results indicate that the application of BIM 5D significantly enhances the efficiency and accuracy of bridge project cost planning. Detailed 3D modeling and dimensional integration enable a dynamic cost budget plan (RAB), in-depth cost analysis, and real-time control. In this research, the application of Building Information Modeling (BIM) 5D in the cost estimation of the bridge structure yielded a Cost Budget Plan (RAB) amounting to IDR 14.533.619.827,25.
    URI
    http://hdl.handle.net/123456789/57366
    Collections
    • 9th CE REFORM [51]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV