Pra Rancangan Pabrik Etil Asetat dari Asam Asetat dan Etanol Kapasitas 15.000 Ton/Tahun
(UII Yogyakarta, 2008)
Preliminary plant design of Ethyl Acetate with capacity 15.000 ton/year is planned to be built in Gresik, the province East Java, in the area of land 25.920 m². This chemical plant will be operated for 330 days/year or 24 ...
Pra Rancangan Pabrik Etil Asetat dari Asam Asetat dan Etanol Kapasitas 15.000 Ton/Tahun
(Universitas Islam Indonesia, 2008)
Preliminary plant design of Ethyl Acetate with capacity 15.000 ton/year is
plannedto be built in Gresik, the province East Java, in the area of land 25.920
m². This chemical plant will be operated for 330days/year or 24 ...