Browsing Chemical Engineering by Subject "Minyak Jarak"
Now showing items 1-3 of 3
-
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton / Tahun
(Universitas Islam Indonesia, 2008)Preliminary design ofBiodiesel with capacity 50,000 ton/year is aplant to be built in Palembang in the area ofland 22,050 m2. This chemical plant will be operatedfor 330 day/year or 24 hours aday with 134 employees <«, ... -
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2008)Preliminary design of Biodiesel with capacity 50,000 ton/year is a plant to be built in Palembang in the area of land 22,050 m². This chemical plant will be operated for 330 day/year or 24 hours aday with 134 employees. ... -
Pra Rancangan Pabrik Metil Ester dari Minyak Jarak dengan Proses Esterifikasi Kapasitas 35.000 Ton/tahun
(Universitas Islam Indonesia, 2024)Indonesia, sebagai negara kaya akan sumber daya alam, bergantung secara signifikan pada bahan bakar minyak bumi untuk memenuhi kebutuhan energinya. Namun, semakin menipisnya cadangan minyak bumi dan peningkatan ...