Browsing Chemical Engineering by Subject "Minyak Jarak"
Now showing items 1-2 of 2
-
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton / Tahun
(Universitas Islam Indonesia, 2008)Preliminary design ofBiodiesel with capacity 50,000 ton/year is aplant to be built in Palembang in the area ofland 22,050 m2. This chemical plant will be operatedfor 330 day/year or 24 hours aday with 134 employees <«, ... -
Pra Rancangan Pabrik Biodiesel dari Minyak Jarak dan Methanol Kapasitas 50.000 Ton/Tahun
(UII Yogyakarta, 2008)Preliminary design of Biodiesel with capacity 50,000 ton/year is a plant to be built in Palembang in the area of land 22,050 m². This chemical plant will be operated for 330 day/year or 24 hours aday with 134 employees. ...