Back Propagation dalam analisis hasil dampak pembangunan infrastruktur Jalan Pauh-Bero Jaya Timur terhadap akses pendidikan di Sekolah Dasar Negeri 1 Bero Jaya Timur Kecamatan Tungkal Jaya Kabupaten Musi Banyuasin
Date
2024-02-07Author
Firdausa, Fadhila
Sieswanto, Panji
Syafitri, Rizqi
Prayuda, Hakas
Metadata
Show full item recordAbstract
The construction of the Pauh-Bero Jaya Timur road in Tungkal Jaya
District, Musi Banyuasin Regency in 2020 will have many impacts on the
surrounding community. The construction of this road infrastructure
improves road access to one of the schools, namely the Bero Jaya Timur
State Primary School 1. The number of students at Bero Jaya Timur State
Elementary School 1, Tungkal Jaya District, Musi Banyuasin Regency is
251 boys and 245 girls. From the results of the distributed questionnaire,
177 respondents were filled in. The questionnaire was distributed using
an online questionnaire via the Google Mail platform. From the results
of the questionnaire distributed, conclusions were drawn, namely: (i) The
assessment results showed that the construction of the Pauh Bero Jaya
Timur road infrastructure was an access road that helped students get to
East Bero Jaya 1 State Primary School, (ii) The construction of the Pauh
Bero Jaya Timur road infrastructure had an impact. in making education
a success, increasing enthusiasm, achievements and aspirations, (iii) The
condition of the East Pauh Bero Jaya road is in good condition, (iv) The
infrastructure development of the East Pauh Bero Jaya road can be relied
upon as infrastructure progress, has the value of independence in
supporting development progress, development can be continuously
improved, and this will have a good impact on regional progress. (iv)
Analysis of the results using Back Propagation found that the largest
error was 30%
Collections
- 6th CE REFORM [41]
