• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 4th CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 4th CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perbandingan Waktu Dan Biaya Pengangkutan Vertikal Antara Material Hoist Dan Manual Handling

    Thumbnail
    View/Open
    Proceeding The 4th CeReform Final-133-144.pdf (488.3Kb)
    Date
    2023-02-15
    Author
    Juniarwoko, Anjar Raharjo
    Musyafa, Albani
    Sulistyantoro, Tri Nugroho
    Ghiffary, Muhammad Farrel
    Metadata
    Show full item record
    Abstract
    In encouraging national development, especially from the tourism sector, Yogyakarta is a tourist destination in Indonesia. The construction services sector is needed to meet the development needs in the tourism sector. Hotel Malioboro Suite is a temporary residence for tourists located on jalan pasar kembang no.29 Yogyakarta with a land area of ± 1500 m2 and the remaining land of ±150 m2 with a width of ± 5 meters and a length of ± 30 meters making the use of stemtransfer materials such as material hoists and manual material handling (MMH) chosen in its implementation. The purpose of this study is to determine the cost of implementing a vertical material transfer system using a material hoist and manual material handling in ceramic installation work. This study looked at the vertical transfer of materials in the ceramic works of each floor. Measurement of cycle productivity between material hoists and manual material handling using a stopwatch. Observed cycle times include 1) load time, 2) hauling time, 3) unloading time, 4) return time, and 5) Lead time. The results showed that the cycle time of the hoist material was lower than mmh. The results of other studies also show that the time and cost in fulfilling 1 m2 of ceramic workmaterials including ceramics, cement, and sand is 60x60 lower than manual material handling. Manual material handling will be quite effective and efficiently used to transfer materials if the project takes a short time and the low altitude is less than 8 m.
    URI
    http://hdl.handle.net/123456789/56250
    Collections
    • 4th CE REFORM [47]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV