• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 3rd CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 3rd CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Dampak Lalu Lintas dan Evaluasi Desain Pembangunan Jembatan Ploso Baru dengan Pemodelan Vissim

    Thumbnail
    View/Open
    Proceeding The 3rd CeReform Final (168-178).pdf (924.1Kb)
    Date
    2022-07-20
    Author
    Untoro, Sigit Wisnu
    Irawan, Muhammad Zudhy
    Malkhamah, Siti
    Metadata
    Show full item record
    Abstract
    The construction of bridges cannot be separated from the impact of traffic ranging from disturbances to security, safety, order and the smooth flow of road transport traffic. Thus, the construction of a new ploso bridge is an activity that requires the preparation of a traffic impact analysis document (ANDALALIN). Data collection is one of the important things in conducting this study, where the data is a description of the traffic around the activity location which will be simulated with the VISSIM model and also using MKJI calculations. The results of this study indicate that there is a decrease in the service level of sections and intersections. The degree of saturation when the existing condition ranges from 0.35 to 0.6 with the highest value being on the Batas Kabupaten Mojokerto-Ploso Road, which is 0.60 with a service level of category C. Intersection 3 with no signal at Ploso Jombang is 12.79 seconds. The degree of saturation during construction conditions ranges from 0.56 to 0.78 with the highest value being on the Ploso-Batas Jombang road section, which is 0.78 with a service level of category D, for the average vehicle delay during construction with the highest value being at Simpang 3 No Signal Ploso Jombang (South) which is 29.72 seconds. In the do nothing and do something scenario, there is an increase in service, especially at the 3rd Unsignalized Junction of Ploso Jombang with the degree of saturation from D (do nothing) to C (do something). The design evaluation of the bridge is only carried out in the section of the deceleration lane which is extended to 40 m.
    URI
    http://hdl.handle.net/123456789/56130
    Collections
    • 3rd CE REFORM [22]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV