• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 2nd CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 2nd CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Kapasitas Tampungan dan Keandalan Embung Wukirsari 1

    Thumbnail
    View/Open
    206-216 (ANALISIS KAPASITAS TAMPUNGAN DAN KEANDALAN EMBUNG WUKIRSARI 1).pdf (259.1Kb)
    Date
    2022-01-24
    Author
    Hadi, Al
    Astuti, Sri Amini Yuni
    Metadata
    Show full item record
    Abstract
    The research on the analysis of the storage capacity and reliability of the Wukirsari 1 Small Dam is motivated by the needs of the community in meeting the needs of raw water. This study aims to determine the amount of reservoir capacity that can be built, as well as the level of reliability of the reservoir after it is used. The reservoir capacity is obtained from a capacity analysis based on water availability, based on water demand, and based on topography. The availability of water in this study was calculated by the F.J Mock method. The reliability of the reservoir is carried out by simulating the reservoir water balance and the reliability level of the reservoir in meeting the community's water needs. The reservoir capacity of the reservoir is 32.407,25 m3 with a live reservoir of 28.506,62 m3 and a dead reservoir of 3.900,63 m3. The projected population for 15 years is 68.384 people with a total raw water requirement of 953.956,8 m3. The reliability level is divided into 3 conditions, the first with a population of 68.384 people, the reliability level is 31,50% and the lowest is 24,07%. Second, with a population of 20.000 people, the reliability level was 100% in February and decreased the following month. Third, with a population of 19.000 people, the level of reliability is 100% every month and can meet existing outflows.
    URI
    http://hdl.handle.net/123456789/56104
    Collections
    • 2nd CE REFORM [24]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV