• Login
    View Item 
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 1st CE REFORM
    • View Item
    •   DSpace Home
    • Lecturers And Researchers
    • Faculty of Civil Engineering and Planning
    • Department of Civil Engineering
    • Proceeding Civil Engineering Research Forum
    • 1st CE REFORM
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Studi Penerapan Konsep Lean Construction Pada Perencanaan Anggaran Biaya Menggunakan Aplikasi Estimator.Id

    Thumbnail
    View/Open
    Proceeding The 1st CeReform Final-101-109.pdf (571.7Kb)
    Date
    2021-07-13
    Author
    Alfajr, Fatimah Zahrah Fatih
    Nugraheni, Fitri
    Metadata
    Show full item record
    Abstract
    In a construction project is still too much waste, which do not produce. By implementing innovations that adopt from the world of manufacturing, which is known as Lean Construction, at the planning stage in calculating the RAB, it is calculated using the-based RAB application web , Estimator.id, can make it easier for estimators to calculate the RAB for construction projects. This study uses data from the Dukuh Maribaya Embung Development Project in Bumiayu Village, Bumiayu District, Brebes Regency, Central Java in the form of Planning Images, Unit Price Lists, Unit Price Analysis, Budget Plans, and Implementation Budget Plans. The data is then calculated using the Estimator.id application. to obtain a comparison of the RAB from the project documents with a value of IDR 288,160,000,000 and the results on the Estimator.id application produce a value of IDR 266,610,000,000, indicating a difference of IDR 21,550,000.00 or 7.47% smaller from the project document while for the RAP, a comparison of RAP from project documents with a value of Rp.195,170,000.00 and the RAP calculation results on the Estimator.id application resulted in a value of Rp.189,310,000.00 showing a difference of Rp. project. The results of the application of theConcept Lean Construction in calculating the RAB and RAP of the dukuh maribaya embung construction project in the estimator.id application, namely by applying thetechnique Integrated Project Delivery (IPD) which can realize the principles of IPD. The Estimator.id application can support theConcept Lean Construction by implementing several Lean Construction Tools to minimize waste in construction projects.
    URI
    http://hdl.handle.net/123456789/56083
    Collections
    • 1st CE REFORM [20]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV