Show simple item record

dc.contributor.authorIbrahim
dc.contributor.authorMusyafa, Albani
dc.contributor.authorFaisol
dc.date.accessioned2025-06-03T04:49:52Z
dc.date.available2025-06-03T04:49:52Z
dc.date.issued2021-07-13
dc.identifier.isbn978-602-450-638-4
dc.identifier.urihttp://hdl.handle.net/123456789/56082
dc.description.abstractThe high urgency of K3 in the construction sector in Indonesia proves that the application of the Occupational Health and Safety Management System (SMK3) can be a reference that regulates various activities in it, as well as manages K3 systematically and comprehensively in a complete management system as an effort to prevent work accidents. The assessment of the implementation of SMK3 in the Sleman DPRD Building Development Project aims to find out how big the level of implementation is and find out what factors influence the fulfillment of its implementation which then provides a response as an effort to take corrective actions/improvement on the implementation of SMK3 implemented. The method used in assessing the implementation of SMK3 is based on the criteria as stipulated in PP No. 50 of 2012 concerning the Implementation of SMK3 by conducting an audit system in which the researcher is the auditor and the implementing party/company is the auditee. Based on the results of the audit and analysis consisting of 166 criteria (Advanced Level) assessment as stated in PP No. 50 of 2012 concerning SMK3, it is known that the number of criteria met/appropriate is 149 criteria with a percentage value of 89.76% and there are 17 Criteria are not met/not appropriate, namely with a percentage value of 10.24% (Minor Category). These results are included in the category of application assessment level (Satisfactory), this proves that the application of SMK3 in the Sleman DPRD Building construction project is in accordance with and refers to the applicable laws and regulations.en_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectanalysis, application of smk3, building constructionen_US
dc.titleAnalisis Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Pada Proyek Konstruksi Gedungen_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record