Show simple item record

dc.contributor.advisorProf. Ir Sarwidi, MSCE, Ph.D, IP-U
dc.contributor.advisorDr. Ir. Edy Purwanto, CES.,DEA
dc.contributor.authorAji, Raden Supramana
dc.date.accessioned2017-12-04T16:50:43Z
dc.date.available2017-12-04T16:50:43Z
dc.date.issued2017-03-27
dc.identifier.urihttps://dspace.uii.ac.id/handle/123456789/4711
dc.description.abstractThe rehabilitation of infrastructure of school buildings before the 2006 earthquake in Yogyakarta, done through auctions contract and carried out by professionals (contractor). Event-DB and P2DB P2DT-AK implemented self-managed by the school committee and the school (teachers and employees), no tender process / tender, which is usually held prior to the implementation of this proyek.Penelitian structure aims to evaluate the efficiency of the implementation of the rehabilitation and reconstruction of school buildings, and evaluate the implementation of quality standards applied in the implementation of the program of rehabilitation and reconstruction of school buildings conducted by means of self aftermath of the earthquake Yogakarta in Sleman district. This research used a descriptive approach, sampling is stratified proportional random sampling by spreading questionnaires, interviews, and copy data RAB schools receiving rehabilitation. The results of the data analysis RAB is recalculated dg tender and self-managed, and analyzed using SPSS version 23. The results in the form of tables and graphs of correlation and regression equation the value of the building. The results were statistically processed questionnaires descriptive. The efficiency level of the rehabilitation and reconstruction program Elementary School buildings are implemented self-managed when compared with the tender, the difference occurs Budget Plan savings of 27.79%. The savings in terms of material when there is difference in savings of 25.55%, and when seen from wages occur savings of 32.37% .The level of efficiency using regression coefficients on variables of building materials 1,042 (a positive sign) means that the increase in the value of materials 1 percent increase the value of buildings amounted to 1,042. Variable wages amounting to 1,042 this means increased 1 percent wage increase the value of buildings amounted to 1,042. Variable residual value 1,000 buildings this means an increase in the residual value of the building 1 percent increase building value of 1,000. The larger the building materials will increase the selling value of the building, the greater the wage rates will increase the selling value of the building, the greater the value of the rest of the building the greater the sales value bangunan.Penerapan quality standards that the rehabilitation and reconstruction program P2DT and P2DBAK on primary school in Sleman district. The application of quality standards implemented planner and supervisor teams reached 99.14%. The application of quality standards held high enough Implementation Team reached 99.14% .en_US
dc.publisherUniversitas Islam Indonesiaid
dc.titleEvaluasi Program Rekonstruksi Gedung Sekolah Dengan Swakelola Pasca Gempa Bumi Yogyakarta (Studi Kasus: Rekonstruksi Gedung Sekolah Dasar Kabupaten Sleman)id
dc.typeMaster Thesisen_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record