Optimalisasi Waktu Dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) (Optimizing Time and Costs Using Time Cost Trade Off Methods)
(Universitas Islam Indonesia, 2017-05-10)Construction area takes a lot of effort to improve the quantity and quality of work, both in terms of construction management and structure so as to improve and achieve better working results. Delays in project work can ... -
PERENCANAAN WAKTU PROYEK DENGAN PRECEDENCE DIAGRAM METHOD PADA PEMBANGUNAN FLYOVER SIMPANG PASAR PAGI ARENGKA (PROJECT SCHEDULING USING PRECEDENCE DIAGRAM METHOD ON SIMPANG PASAR PAGI FLOVER , ARENGKA )
(Universitas Islam Indonesia, 2018-11-21)Network Planning planning with this PDM method will be used for the construction of Arengka Morning intersection Flyover, Pekanbaru, Riau Province. Network planning planning with PDM is important because the morning Arengka ...