Browsing Civil Engineering by Author "Julio Muharmeiza, 13511259"
Now showing items 1-1 of 1
-
ANALISIS PERCEPATAN PROYEK DENGAN METODE PENAMBAHAN JAM KERJA OPTIMUM “Studi Kasus Pembangunan RSUD Tipe B Magelang” (ANALYSIS OF ACCELERATION PROJECT WITH ADDITIONAL WORKING TIME OPTIMUM METHOD) “Study Case Of Magelang Type B Hospital”
Julio Muharmeiza, 13511259 (Universitas Islam Indonesia, 2018-09-25)A construction project is often delayed in its implementation. The delay is caused by several factors, including climate factors which are the biggest trigger factors, design changes when implementation also often occurs ...