Identifikasi Pengujian Pile Driving Analyzer Pier 51A Pada Proyek Pembangunan Tol Yogyakarta – Bawen
Abstract
In general, the foundation is a part of the construction structure which has
the function of distributing the load from the structure above it to the part
of the soil below it evenly. For the project that I did this research using
bored pile type foundation. The direct testing method in the field is called
the Pile Driving Analyzer Test (PDA) testing method. In essence, the Pile
Driving Analyzer (PDA) test is an important test if you want to ensure the
quality and slope of the designed foundation. In carrying out the Pile
Driving Analyzer test there are several procedures that must be considered.
Therefore, it is very necessary to carry out this test in accordance with
technical guidelines, project specifications, as well as good and proper
implementation when carrying out tests on bored pile foundations through
the Pile Driving Analyzer (PDA). There are several testing procedures on
the Test Pile Driving Analyzer (PDA), such as the preparation process, the
implementation process, and the monitoring process. The Pile Driving
Analyzer (PDA) test was carried out when the foundation piles were 28 days
old. This is done because it has a specific purpose, namely so that the soil
reaches a recovery condition since the bored pile foundation was installed.
The full compressive axial load on the PDA test foundation pile is
determined to be at least 2 times more than the design load.