Show simple item record

dc.contributor.advisorFitri Nugraheni, S.T, M.T., Ph.D
dc.contributor.authorMahmudah, Zulfatun
dc.date.accessioned2017-11-27T10:55:00Z
dc.date.available2017-11-27T10:55:00Z
dc.date.issued2017-05-29
dc.identifier.urihttps://dspace.uii.ac.id/handle/123456789/4545
dc.description.abstractConstruction project activity is a long process, which in practice are found problems and constraints One problem that often occurs is inefficiency and waste (waste) in the implementation of construction. Waste is an activity in projects that result in losses. The author tried to do a study on the waste that occurs in construction projects in the Yogyakarta area by analyzing the type of material that the highest frequency of occurrence and the factors that cause it. Research using the mean rank analysis carried out on the construction project is being done in Yogyakarta.Metode used in this study were questionnaires, interviews, and literature. After doing research, then do the data processing and the obtained mean values indicating the type of material waste its highest frequency and the most influential factor causing waste. From the analysis of the type of waste material with the highest incidence rate in construction projects in Yogyakarta are wooden formwork with a mean value of 2.6190. In addition, factors that influence causes the waste to the type of timber formwork material due to damage caused by manual carriage.en_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectwasteen_US
dc.subjectbuilding constructionen_US
dc.subjectlosses, construction materialsen_US
dc.titlePersepsi Pengendalianwastematerial Konstruksi Pada Proyek Gedung Bertingkat Di Yogyakarta (The Control of the Construction Waste Materialsperceptionon Story Building Project in Yogyakarta)en_US
dc.typeThesisen_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record