Show simple item record

dc.contributor.advisorDr. Ir. Elisa Kusrini, M.T., CPIM., CSCP.
dc.contributor.authorALMA FITRIA MILANIA
dc.date.accessioned2022-08-09T08:05:52Z
dc.date.available2022-08-09T08:05:52Z
dc.date.issued2022-04-19
dc.identifier.urihttps://dspace.uii.ac.id/handle/123456789/38304
dc.description.abstractThe industrial sector has a great impact on the Indonesian GDP especially the metal industry. Metal casting companies must be able to compete in the market with an increasingly advanced industrial revolution that makes the market more competitive. There are lot of challenges and opportunities faced by the metal industry and one of those is the supply chain. The supply chain here is related to the flow of goods and information from upstream to downstream. With an effective and efficient supply chain, the company is able to compete with other companies and has a competitive advantage. This paper aims to assess the supply chain performance on the CV. Sumber Baja Perkasa, metal casting company, that located in Ceper, Klaten. In assesing the supply chain performance, the researchers used SCOR12 and SCOR Racetrack as a tool. By using SCOR12, the researcher can measure the supply chain performance based on several attributes and SCOR Racetrack as a tool and framework to calculate the gap between the actual and target. The researcher discovered an issue with product delivery delays and a discrepancy in the number of orders. The SCOR measurements indicate that there is a concern with reliability. According to the supply chain performance calculation on SCOR employing level 3 of the reliability attribute, there is 68.5 percent delivery quantity accuracy, 46.1 percent customer commit date achievement time customer receiving, and 92.4 percent delivery location accuracy. Human mistake, restricted manufacturing capacity, miscalculation, a scarcity of raw materials, and data difficulties are the primary causes of the gaps in those three elements. The issue that must be prioritized in this case are production capacity. Projects tha can be implemented is production planning such as forecasting, master production schedule, material need planning, and capacity available, which are proposed to overcome the production capacity.en_US
dc.publisherUniversitas Islam Indonesiaen_US
dc.subjectmetal casting companyen_US
dc.subjectsupply chainen_US
dc.subjectSCOR12en_US
dc.subjectSCOR Racetracken_US
dc.titleSupply Chain Performance Measurement Using Scor Racetrack On Sumber Baja Perkasa Metal Casting Company (Study Case: Cv. Sumber Baja Perkasa, Klaten)en_US
dc.Identifier.NIM18522215


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record