• Login
    Search 
    •   DSpace Home
    • Lecturers And Researchers
    • Search
    •   DSpace Home
    • Lecturers And Researchers
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 29

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Studi Penerapan Konsep Lean Construction Pada Perencanaan Anggaran Biaya Menggunakan Aplikasi Estimator.Id 

    Alfajr, Fatimah Zahrah Fatih; Nugraheni, Fitri (Universitas Islam Indonesia, 2021-07-13)
    In a construction project is still too much waste, which do not produce. By implementing innovations that adopt from the world of manufacturing, which is known as Lean Construction, at the planning stage in calculating ...
    Thumbnail

    Analisis Faktor Penyebab dan Mitigasi Risiko pada Proyek Konstruksi dengan Metode SEM dan FTA (Studi Kasus : Pembangunan Gedung Ibu dan Anak Terpadu RS Sardjito) 

    Martanto, Aribowo; Nugraheni, Fitri (Universitas Islam Indonesia, 2025-02-07)
    The construction industry, particularly in complex projects such as the Integrated Mother and Child Building at RS Sardjito, faces high risks that require analysis of causal factors and mitigation through innovative technology ...
    Thumbnail

    Identifikasi Potensi Bahaya pada Pekerjaan Perawatan Bangunan Menggunakan Metode Construction Safety Analysis (CSA) di Departemen Jasa Perawatan & Operasional Fasilitas PT Dirgantara Indonesia 

    Ardi, Bagas Novika; Nugraheni, Fitri (Universitas Islam Indonesia, 2025-02-07)
    Occupational Health and Safety (OHS) is a critical element in supporting productivity and operational sustainability, particularly in the construction sector, which has the highest workplace accident rates. This study ...
    Thumbnail

    Kebutuhan dasar shelter pasca bencana: Tinjauan terhadap literatur akademik, regulasi dan standar 

    Ardiansyah, Raihan Prasetyawan; Nugraheni, Fitri (Universitas Islam Indonesia, 2025-02-07)
    The provision of post-disaster shelters is crucial, yet it continues to face challenges related to sustainability, geometric configuration, and issues concerning performance and transportation. To provide post-disaster shelters ...
    Thumbnail

    Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Bata Ringan Dengan Menggunakan Method Productivity Delay Model (MPDM) 

    Pratama, Rizky Allam Zandriyan; Nugraheni, Fitri (Universitas Islam Indonesia, 2022-01-24)
    Productivity is a fundamental factor that influences the performance of competitiveness in the construction industry. Increasing the level of productivity relates to the time needed to complete the work and will directly ...
    Thumbnail

    Analisis pencegahan kecelakaan kerja dengan metode HIRADC pada pekerjaan perkerasan lentur proyek pembangunan ruas jalan Tawang – Ngalang segmen II 

    Berty, Celviani Dityaningrum; Nugraheni, Fitri (Universitas Islam Indonesia, 2024-07-26)
    The construction of Provincial Roads in Gunung Kidul is motivated by the income disparity between the northern, central, and southern regions of Java. The National Tourism Strategic Area program at Candi Prambanan aims ...
    Thumbnail

    Analisis severity index risiko keselamatan konstruksi berdasarkan sudut pandang permen PU No 10 tahun 2021 studi kasus bendungan bener 

    Pratama, Dhika Arif; Nugraheni, Fitri; Sulistyantoro, Tri Nugroho; Ghiffary, Muhammad Farrel (Universitas Islam Indonesia, 2024-07-26)
    Every construction project must have risks both low, medium and high risk. Risk cannot be completely eliminated, but it can be managed effectively, to reduce its effect on achieving project objectives an excellent risk ...
    Thumbnail

    Perbandingan produktivitas tenaga kerja ketika terjadi tundaan dengan ketika tundaan diminimalisir pada pekerjaan pemasangan granit 

    Rahmawati, Reni; Nugraheni, Fitri (Universitas Islam Indonesia, 2024-07-26)
    Productivity in construction projects is measured by fieldwork effectiveness. Delays such as chatting or smoking can reduce productivity and ultimately affect the overall volume and value of the work. Therefore, it is ...
    Thumbnail

    Analisa kecelakaan kerja pekerjaan pemasangan stopper clamp dengan metode fault tree analisys (studi kasus: proyek jetty upper structure, pltu jawa 9 dan 10) 

    Hasyimi, Azka Farouq; Nugraheni, Fitri (Universitas Islam Indonesia, 2024-07-26)
    The construction sector is an important sector that plays a role in the progress of Indonesia, one of which is the development of construction projects. The construction of construction projects cannot be separated from ...
    Thumbnail

    Analisis Perbandingan Rap Kontrak Tahun Tunggal Dan Tahun Jamak Pada Pekerjaan Rehabilitasi Blok Beton Groundsill 

    Huda, A. Khairul; Nugraheni, Fitri; Sulistyantoro, Tri Nugroho; Firdaus, Ad Zulfa Geofani (Universitas Islam Indonesia, 2023-02-15)
    The construction of facilities and infrastructure in large rivers always has its own challenges because the implementation of construction work on rivers must pay attention to many factors such as river water level conditions, ...
    • 1
    • 2
    • 3

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CommunityBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Discover

    Author
    Nugraheni, Fitri (29)
    Sulistyantoro, Tri Nugroho (4)Abma, Vendie (2)Wibowo, Agung (2)Alfajr, Fatimah Zahrah Fatih (1)Amal, Ikhlasul (1)Apriansyah, Risky (1)Ardi, Bagas Novika (1)Ardiansyah, Raihan Prasetyawan (1)Ardiyanto, Bukhori A (1)... View MoreSubjectAccident hazard, Risk assessment, Arjuna Tower Apartment, Personal protective equipment (PPE) (1)AS/NZS 4360:2004 (1)Bener Dam Package 4 Risk Identification Risk Assessment Risk Matrix (1)BIM 3D (1)Building reliability, Level of service, SLF (1)Case based reasoning, CBR, Criteria, Road maintenance (1)Cash flow, PDM, Profit Maksimal, Proyek Jalan, Kontaktor (1)Comparison (1)Construction Occupational Safety and Health HIRADC Pavement (1)Cos (1)... View MoreDate Issued2025 (9)2024 (4)2023 (14)2022 (1)2021 (1)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV