• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Kimia Methyl Mercaptan dari Methanol dan Hidrogen Sulfide dengan Kapasitas 20.000 Ton/Tahun

    Thumbnail
    View/Open
    01.0 cover.pdf (49.85Kb)
    02 preliminari.pdf (123.3Kb)
    03 daftar isi.pdf (143.5Kb)
    04 abstract.pdf (64.98Kb)
    05.1 bab 1.pdf (281.2Kb)
    05.2 bab 2.pdf (116.0Kb)
    05.3 bab 3.pdf (955.3Kb)
    05.4 bab 4.pdf (2.486Mb)
    05.5 bab 5.pdf (62.99Kb)
    Date
    2007
    Author
    Nurhidayat, Rofik
    Darmanto S, Indra
    Metadata
    Show full item record
    Abstract
    Preliminary design of Methyl Mercaptan plant by capacity of 20,000 tons/year is built in West Kalimantan, using the land area of 30,000 m. This chemical plant will be operated for 330 days/year or 24 hours per day and employ about 251 employees. The needs of raw material are methanol 2,616.8787 kg/hour and hidrogen sulfide 7876 9278 kg/hour. The production process will be operated at temperature of 350ºC at pressure about 7.83 atm using Reaktor Fixed Bed Multi tube with conversion 80 %. The utilities consist of 131,076.357 kg/hour of cooling water 487.81 kg/hour of dowtherm A, 3,229.167 kg/hour of housing water and 612.34 kg/hour of steam. The power of electricity provided by PLN is about 12,000 KW . This chemical plant also uses generator set as rescue. An economic analysis shows that the chemical plant needs to be covered by fixed capital of about Rp. 138.167.511.138 working capital of about Rp. 67 985 038 630. The profit before tax is Rp. 60.548.564.655 while the profit after tax is Rp 30 774 782 327 Percentage of return on investmen (ROT) before tax is 44.01 % while after tax is 22.005 %. Pay out time (POT) before tax is 1.85 years while after tax is 313 years. The value of break event point (BEP) for about 40.26 % and shut down point (SDP) of about 26.36 %. Based on the economic analysis, it is concluded that plant design of Methyl Mercaptan with capacity of 20,000 tons/year is visible to be built.
    URI
    http://hdl.handle.net/123456789/3189
    Collections
    • Chemical Engineering [1334]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV