• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Civil Engineering and Planning
    • Civil Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Civil Engineering and Planning
    • Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimalisasi Durasi dan Biaya Proyek Menggunakan Metode Simulated Annealing (Studi Kasus Proyek Penggantian Jembatan Karanggayam Yogyakarta)

    Thumbnail
    View/Open
    01.0 cover.pdf (32.36Kb)
    02 preliminari.pdf (107.1Kb)
    03 daftar isi.pdf (340.0Kb)
    04 abstract.pdf (89.95Kb)
    05.1 bab 1.pdf (213.6Kb)
    05.2 bab 2.pdf (216.7Kb)
    05.3 bab 3.pdf (1.441Mb)
    05.4 bab 4.pdf (433.4Kb)
    05.5 bab 5.pdf (4.043Mb)
    05.6 bab 6.pdf (464.0Kb)
    05.7 bab 7.pdf (140.9Kb)
    06 daftar pustaka.pdf (76.98Kb)
    Date
    2003
    Author
    Setyawan, Rudy
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/123456789/2939
    Collections
    • Civil Engineering [4758]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV