Minimasi Cycle Time Proses Produksi Mebel Berdasar Pendekatan Lean Manufacturing Dengan Menggunakan Metode Value Stream Mapping (VSM) (STUDI KASUS : CV. Ania Karyatama)
dc.contributor.advisor | Yuli Agusti Rochman | |
dc.contributor.author | 15522232 Zul Fathi Fuad M | |
dc.date.accessioned | 2021-06-11T09:17:28Z | |
dc.date.available | 2021-06-11T09:17:28Z | |
dc.date.issued | 2020 | |
dc.identifier.uri | https://dspace.uii.ac.id/123456789/29226 | |
dc.publisher | Universitas Islam Indonesia | en_US |
dc.subject | Minimasi Cycle Time | en_US |
dc.subject | Proses Produksi Mebel | en_US |
dc.subject | Pendekatan Lean Manufacturing | en_US |
dc.subject | Metode Value Stream Mapping (VSM) | en_US |
dc.subject | CV. Ania Karyatama | en_US |
dc.title | Minimasi Cycle Time Proses Produksi Mebel Berdasar Pendekatan Lean Manufacturing Dengan Menggunakan Metode Value Stream Mapping (VSM) (STUDI KASUS : CV. Ania Karyatama) | en_US |
dc.Identifier.NIM | 15522232 |
Files in this item
This item appears in the following Collection(s)
-
Industrial Engineering [2224]