Show simple item record

dc.contributor.authorNurul, Latifah Kusumah
dc.date.accessioned2020-07-21T02:15:16Z
dc.date.available2020-07-21T02:15:16Z
dc.date.issued2019-02-08
dc.identifier.urihttp://hdl.handle.net/123456789/22773
dc.description.abstractDistribution and warehousing is one of the potential investment opportunities and it can be used for short and long term project. In the development of an investment project, analysis and calculations are needed to determine the feasibility of the project. This study aims to determine the feasibility of distribution and warehousing project in the construction of modern warehouse by PT Pos Logistic Indonesia. This feasibility study consists of market aspects, technical aspects, financial aspects and sensitivity analysis. The method used to analyze market aspects and technical aspects is forecasting and survey methods. In the financial aspects, investment assessment criteria are implemented using Net Present Value (NPV), Payback Period (PP), Internal Rate of Return (IRR) and Benefit Cost Ratio (BCR) methods. From the results calculation, Net Present Value has positive value of IDR 366.778.080.718, then Payback Period will return within 1 year 5 months, the Internal Rate of Return is 134,31% and Benefit Cost Ratio is 4,2. Then with Net Present Value that has positive value, the Payback Period is smaller than the maximum limit of its economic life, then Internal Rate of Return is greater than the discount factor level used and Benefit Cost Ratio is greater than 1, so the project of modern warehouse development by PT Pos Logistic Indonesia is feasible to run. In the sensitivity analysis with a decrease in the level of optimistic and moderate conditions of 4% and 40%, it still indicates that the project of investment is feasible.en_US
dc.description.sponsorshipAgus Mansuren_US
dc.publisherTeknik Indusrtien_US
dc.subjectFeasibility Studyen_US
dc.subjectMarket Aspecten_US
dc.subjectTechnical Aspecten_US
dc.subjectFinancial Aspecten_US
dc.subjectPT Pos Logistic Indonesia.en_US
dc.titlePROJECT FEASIBILITY STUDY ON INVESTMENT OF DISTRIBUTION AND WAREHOUSING MANAGEMENTen_US
dc.title.alternativeCase Study at PT Pos Logistic Indonesiaen_US
dc.typeThesisen_US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record