dc.description.abstract | Preliminary design of Ethanol with capacity 45.000 ton/year is plant
be built in industry area Tangerang-Banten, in the area of land 30,000 m Ihis
chemical plant will be operated for 330 day/year or 24 hours aday with 167
employees. Raw material neededs is Ethylene 4,943.29 kg/hour, Water 8,005 333
kg/hour. The production process will be operated at temperature 250° C, at
pressure about of 68 atm using Fixed Bed Multitube with convesion23% . The
utiliy consist of 115,4992.4552 kg/hour of cooling water, 2.216.94kg/hour of
processing water, 2041.6667 kg/hour of housing water, 241,838.5891 kg/hour of
steam 3615.081 m³/hour of fuel while the power of electricity of about
15.915.128 kwh provided by PLN. This chemical plant also use generator set as
An economic analysis shows thats this chemical plant need to be covered
by fixed capital of about Rp.369,203,179,395.53, working capital of about
Rp 226 027 125 785.75. The profit before tax is Rp.79,505,888,323.88 while the
profit after tax is Rp.39,752,944,161.94. Percentage of return on investemen
(ROI) before tax is 21,53% while after tax is 11,77%. Pay out time (POT) before
tax is 317 years while after tax is 4,82 years, Discounted cashflow rate (DLbR)
for about 23 99% The value ofbreak evekpoint (BEP) for about 52,74% and shut
down point (SDP) of about 21,04%. Based on the economic analysis, It is
concluded that plant design of Ethanol with capacity 45,000 ton/years visible to
be built. | en_US |