Pra Rancangan Pabrik Glukosa Dari Jagung Kapasitas 30.000 Ton/Tahun
Abstract
Preliminary plant design of Crystal Glukose with capacity 30,000 tons/year will
he built in North Lampung, in the area of land 40,000 m~. This chemical plant will
operate during 330 days/year or 24 hours a day with 155 employees.
Raw materials neededare corns 5,642.6148 kg/hour, water 15,162.2034 kg/hour.
The hydrolisis process theproduce glukose operates at 100"C temperature, and at I atm
pressure using Continuous Stirred Tank Reactor (CSTR) with conversion 97%. The utiliy
consist of 11,924.0293 kg/hour of cooling water, 13,657.9433 kg/hour of processing
water, 1.4583 m3/hour ofhousing water, 2,220.9999 kg/hour ofsteam, 350,8134 kg/hour
offuel while the power of electricity ofabout 400 kwh provided by PLN. This chemical
plant also use generator set as reserve.
An economic analysis shows that this chemical plant needto be covered by fixed
capital of about Rp 92,549,842,004.34, working capital ofabout Rp 65,359,250,064.32.
The profit before tax is Rp 24,638,482,206.76 while the profit after tax is Rp
12,319,241,103.38. Percentage of return on investment (ROl) before tax is 26.6219%
while after tax is 13.3109%. Pay out time (POT) before tax is 2.8883 years while after
tax is 4.6924 years. The value of break even point (BEP) for about 45.7540% and shut
down point (SDP) of about 25.3775%. Based on the economic analysis, it is concluded
that plant design ofCrystal Glukose with capacity 30.000 ton/years visible to built.