• Login
    View Item 
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    •   DSpace Home
    • Students & Alumnae
    • Undergraduate Thesis
    • Faculty of Industrial Technology
    • Chemical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Glukosa Dari Jagung Kapasitas 30.000 Ton/Tahun

    Thumbnail
    View/Open
    04521040 Lili Sandriani-04521076 Ardhiani NPP.pdf (4.535Mb)
    Date
    2008
    Author
    Lili Sandriani, 04521040
    Ardhiani NPP, 04521076
    Metadata
    Show full item record
    Abstract
    Preliminary plant design of Crystal Glukose with capacity 30,000 tons/year will he built in North Lampung, in the area of land 40,000 m~. This chemical plant will operate during 330 days/year or 24 hours a day with 155 employees. Raw materials neededare corns 5,642.6148 kg/hour, water 15,162.2034 kg/hour. The hydrolisis process theproduce glukose operates at 100"C temperature, and at I atm pressure using Continuous Stirred Tank Reactor (CSTR) with conversion 97%. The utiliy consist of 11,924.0293 kg/hour of cooling water, 13,657.9433 kg/hour of processing water, 1.4583 m3/hour ofhousing water, 2,220.9999 kg/hour ofsteam, 350,8134 kg/hour offuel while the power of electricity ofabout 400 kwh provided by PLN. This chemical plant also use generator set as reserve. An economic analysis shows that this chemical plant needto be covered by fixed capital of about Rp 92,549,842,004.34, working capital ofabout Rp 65,359,250,064.32. The profit before tax is Rp 24,638,482,206.76 while the profit after tax is Rp 12,319,241,103.38. Percentage of return on investment (ROl) before tax is 26.6219% while after tax is 13.3109%. Pay out time (POT) before tax is 2.8883 years while after tax is 4.6924 years. The value of break even point (BEP) for about 45.7540% and shut down point (SDP) of about 25.3775%. Based on the economic analysis, it is concluded that plant design ofCrystal Glukose with capacity 30.000 ton/years visible to built.
    URI
    http://hdl.handle.net/123456789/18702
    Collections
    • Chemical Engineering [1334]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV